Installing the drive sheaves and belts – Grain Systems PNEG-1891 User Manual

Page 37

Advertising
background image

Chapter 6: Installing the Wet Bin

Figure 6-6 Bolt locations for Belt Guard Body

Installing the Drive Sheaves and Belts

To ensure that the load auger rotates, you must install the drive sheaves and belts. The motor turns the
drive sheaves and belts, and the drive sheaves and belts turn the load auger.

1. Insert the key into the keyway on the auger drive shaft.

2. Place 16 inch sheave (D52–0001) on the auger drive shaft.

Pneg-1891 Portable Dryers

37

Advertising