8. 30"-36" Head Platform Right Hand Drive

54

PNEG-1849 30"-36" Bucket Elevator Platform and Ladder “X” Series

Connect Deck C to Cross Deck Support Channel and to Toe Board

NOTE: The orientation of the flanges on Deck C is critical to subsequent steps. Tighten bolts only finger

tight until deck alignment is complete.

1. Locate the pre-assembled Deck C. This deck consists of two (2) planks.

2. Orient Deck C with hole C3 at the discharge end of the lower head.

3. Make sure the extended kick plate flange of Deck C is away from the lower head assembly.

(See Figure 8J below and

Figure 8K on Page 55.)

4. Align holes. Use a punch as needed to line up the holes:

a. For 36" - Deck hole C3 and channel hole X5 at discharge end.

b. For 30" - Deck hole C3 and channel hole Y5 at discharge end.

5. Connect cross deck support channel and Deck C using 3/8" x 1" carriage bolts (S-3585) with flange

nuts (S-10028). Connect all holes between channel and deck.

(See Figure 8J.)

6. Align and connect Deck C to toe board using 3/8" x 1" bolts (S-7469) with flange nuts (S-10028).

a. Deck hole C1 to toe board hole A4.

b. Deck hole C2 to toe board hole A2.

Figure 8J Deck C to Cross Deck Support Channels