background image

8. Sidewall Assembly

34

PNEG-805 36' Diameter 40°/45° NCHT Commercial Hopper Tanks

Caulking Detail

Figure 8B Standard, Triple and Quad Punched Sidewall Sheets

as Viewed from Outside.

Apply one strip of caulking near the outside edge of the outer sheet and between the outer two (2) rows
of bolts, refer to

Figure 8C

. A strip of caulking 10" long, should be placed along the horizontal seams.

Before bolting the next ring in place, apply one strip of caulking 10" long on the front of the underlapped
sheet at each joint. Also, a 10" strip of caulking is to be placed along the lower horizontal edge of lapping
sheet at every vertical seam. This will fill the space that occurs between the holes caused by the
overlapped sheets. Additional 10" strips should be used to fill gaps that occur with heavier gauges.

Figure 8C As Viewed from Inside of Bin (Externally stiffened reverse rolled sheets shown.)

Ref #

Description

A

Quad Punch Caulking Detail

B

Triple Punch Caulking Detail

C

Double Punch Caulking Detail

D

Laminated Sheet Detail (Caulking not shown.)