Aeration package (optional) (continued), Aeration – Grain Systems Tanks PNEG-805 User Manual

Page 63

Advertising
background image

17. Aeration

PNEG-805 36' Diameter 40°/45° NCHT Commercial Hopper Tanks

63

Aeration Package (Optional) (Continued)

Figure 17A Typical Installation

Ref #

Description

A

Reinforcement ring weld to sidewall inside and outside (SCHT-2458)

B

18" Angle Ring (Bolt or weld to elbow tube after installation.) (F-895)

C

Elbow Tube

D

Two (2) Layers of Sidewall

E

Bin Hopper

F

Corrugated perforated tube (18" diameter standard) with corrugated coupler.

G

Hold-Down (Typical)

H

Mark location (see side profile on

Page 64

) and field cut a 18-1/8". Diameter hole between

stiffeners to allow installation of the elbow. Do not locate hole on vertical sidewall seam.

Advertising