Assembly, Chapter 4 assembly, Installing intake shaft – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1434 User Manual
Page 13
Advertising
![background image](/manuals/277796/13/background.png)
PNEG-1434 6", 8" and 10" Roof Augers
13
4. Assembly
Installing Intake Shaft
A. Begin by assembling the intake shaft to the flight using the required grade 8 bolts and stover nuts.
and
Figure 4A
B. Next bolt the bearing with flangette to the studs on the hopper using the required lock washer
and nut.
Figure 4B
Flight Hardware
6"
3/8"-16 x 2" Grade 8 Hex Bolts
8"
7/16"-14 x 3" Grade 8 Hex Bolts
10"
1/2"-13 x 3-1/2" Grade 8 Hex Bolts
Hopper Bearing Nut
6"
5/16"-18 Hex Nut
8"
3/8"-16 Hex Nut
10"
1/2"-13 Hex Nut
Advertising