Assembly, Chapter 4 assembly, Installing intake shaft – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1434 User Manual

Page 13

Advertising
background image

PNEG-1434 6", 8" and 10" Roof Augers

13

4. Assembly

Installing Intake Shaft

A. Begin by assembling the intake shaft to the flight using the required grade 8 bolts and stover nuts.

(See Chart below

and

See Figure 4A.)

Figure 4A

B. Next bolt the bearing with flangette to the studs on the hopper using the required lock washer

and nut.

(See Chart below

and

See Figure 4B.)

Figure 4B

Flight Hardware

6"

3/8"-16 x 2" Grade 8 Hex Bolts

8"

7/16"-14 x 3" Grade 8 Hex Bolts

10"

1/2"-13 x 3-1/2" Grade 8 Hex Bolts

Hopper Bearing Nut

6"

5/16"-18 Hex Nut

8"

3/8"-16 Hex Nut

10"

1/2"-13 Hex Nut

Advertising