Chapter 7: roof assembly – Grain Systems Tanks PNEG-4135A User Manual
Page 138
Advertising
![background image](/manuals/277829/138/background.png)
Figure 7-48 Installing the first upper roof panel
C
Upper roof panel (CTR-0337)
E
5/16-18 x 1 flange bolt with sealing washer (S-
10260)
D
Middle roof panel (CTR-0343)
F
5/16 in. flange nut (S-3611)
15.With assistance, position the adjacent upper roof panels (C) overlapping the previous upper roof
panels.
16.Install flange bolts (E) and flange nuts (F) to secure the overlapping panels as shown.
138