3 initial commissioning, Initial commissioning – Xylem ProLab 1000 BENCH TOP pH METER User Manual
Page 18
Advertising
Commissioning
ProLab 1000
18
ba75576e04
01/2011
3.3
Initial commissioning
Perform the following activities:
z Insert the batteries (see page 77)
z Connect the power pack (see page 17).
z Switch on the meter (see page 19)
z Set the language (see page 23)
z Set the date and time (see page 25)
z Set up the access authorization for electronic keys (see page 27)