3 initial commissioning, Initial commissioning – Xylem ProLab 1000 BENCH TOP pH METER User Manual

Page 18

Advertising
background image

Commissioning

ProLab 1000

18

ba75576e04

01/2011

3.3

Initial commissioning

Perform the following activities:

z Insert the batteries (see page 77)
z Connect the power pack (see page 17).
z Switch on the meter (see page 19)
z Set the language (see page 23)
z Set the date and time (see page 25)
z Set up the access authorization for electronic keys (see page 27)

Advertising