1 manual storage, Manual storage – Xylem ProLab 1000 BENCH TOP pH METER User Manual

Page 62

Advertising
background image

Operation

ProLab 1000

62

ba75576e04

01/2011

4.7.1

Manual storage

Proceed as follows to transmit to the data storage and simultaneously
download to the interface a measurement dataset:

If the data storage is full

The following window appears if all storage locations are occupied:

You have the following options:

z To erase the entire data storage, confirm Yes.
z To cancel the storage process and switch to the measured value

display, confirm No. Then you can e.g. transmit the stored data to a
PC (see page 65) and subsequently erase the storage (see
page 68).

1

Open the menu for manual storage with <STO>.

2

If necessary, use <

▲><▼> and <MENU/OK> to change and

confirm the SAMPLE ID (1 ... 999).
The dataset is stored. The meter switches to the measured
value display.

- 26.04.2006 11:24:16

- pH 7.000

24.8 °C SC

SAMPLE ID:

1

Continue

<STO> 1 of 646

Data storage full. Erase?

Yes

No

Warning

Advertising