3 sample input power panels, Primary service – Alpha Technologies PN-4 User Manual

Page 18

Advertising
background image

031-103-B0-004, Rev. D

18

4.0 Installation,

continued

4.1

Utility Powering, continued

4.1.3 Sample Input Power Panels

For more information on available models of the Input Power Panel, refer to Section
5.0, PN Series Options.

Fig. 4-3, Schematic: Primary Service BBX-100A-8POS with IPP-240-3

Fig. 4-4, Schematic: Primary Service BBX-100A-8POS with IPP-120-3

IP P -120-3

120V /20A 120V /20A

120V /20A

G F C I

Neutral

L ine 1

L ine 2

15A

20A

20A

50A

20A

F rom

S ervic e

S upply

Main B onding

J umper

G

N

Load

Service

and

Distribution

Grounding

Electrode

Conductor

Lightning

Protection

Service

and

Distribution

Service

Main

Load

BBX-100A-8POS

Grounding

Electrode

Conductor

Lightning

Protection

Primary Service

1) Main bonding jumper is installed.
2) Grounding electrode conductor is installed.
3) Lightning protection is bonded outside of cabinet.

Primary Service

1) Main bonding jumper is installed.
2) Grounding electrode conductor is installed.
3) Lightning protection is bonded outside of cabinet.

240/15A

Neutral

S ervic e

Main

L ine 1

L ine 2

15A

15A

15A

50A

B B X -100A-8PO S

IP P -240

-

3

240V /15A

240V /15A

120V /15A

G F C I

240V /15A

Main B onding

J umper

G

N

From

Service

Supply

Advertising
This manual is related to the following products: