Secondary service, Primary service – Alpha Technologies PN-4 User Manual

Page 20

Advertising
background image

031-103-B0-004, Rev. D

20

4.0 Installation,

continued

4.1

Utility Powering, continued

4.1.3

Sample Input Power Panels, continued

Fig. 4-8, Schematic: Primary Service BBX-70A with IPP-240-1

Fig. 4-7, Schematic: Secondary Service BBX-70A with IPP-120-1

G

N

G F C I

20A

G

N

G F C I

15A

Secondary Service

1) Main bonding jumper is NOT installed.
2) Grounding electrode conductor is NOT installed.
3) Lightning protection is part of feeder supply.

Service

and

Distribution

Load

Equipment

Grounding

Condutor

NO Main Bonding

Jumper

BBX-70A

120/20A

120/15A

IPP-120-1

From

Feeder

Supply

Line 1

Line 2

Neutral

From

Service

Supply

Line 1

Line 2

Neutral

Grounding

Electrode

Conductor

Lightning

Protection

Primary Service:

1) Main bonding jumper is installed.
2) Grounding electrode conductor is installed.
3) Lightning protection is bonded outside of cabinet.

BBX-70A

Main Bonding Jumper

240/15A

120/15A

Service

and

Distribution

Load

IPP-240-1

15A