3 preliminary check, Preliminary check – B&K Precision 4052-4055 - Manual User Manual

Page 15

Advertising
background image

15

2.3 Preliminary Check

Complete the following steps to verify that the generator is ready for use.

1.

Verify AC Input Voltage

Verify and check to make sure proper AC voltages are available to power the

instrument. The AC voltage range must meet the acceptable specification as

explained in section 2.1.

2.

Connect Power

Connect AC power cord to the AC receptacle in the rear panel and press the power

switch to the ON position to turn ON the instrument. The instrument will have a

boot screen while loading, after which the main screen will be displayed.

3.

Self Test

Press Utility, select 1/2 from the menu to enter the second menu page, and select

Test/Cal option. Then, select SelfTest option. The instrument has 3 self test options

to test the screen, keys, and the LED back lights of the function, menu, and channel

output keys.

ScrTest Select this option to do a screen test. The screen will turn into a solid

color background.

Advertising