5 installation of the sample tray, Installation – Hach-Lange GANIMEDE N User Manual

Page 26

Advertising
background image

26

Installation

Table 2 Tube overview for analysis unit N

3.1.5

Installation of the sample tray

The position designations for the sample containers are printed next to the sampling
openings.

1. Make sure that the sample changer is switched off.

2. Load the sample containers with at least 15 mL of homogenized samples and zero or

standard solution. Add magnetic rods if necessary.

3. Place the filled sample containers on the sample tray without interruption, starting

with position 1.

4. Place the sample tray on the spindle of the sample changer from above.

5. Turn the sample tray until it locks.

6. Switch on the sample changer.

Identification

Color in tube

plan

Length

Dia-

meter

Colored

adapter

Connected:

A: (included in

the scope of

delivery of the

sample

changer)

Gray

400 mm

2.67 mm

-

Sample changer sample needle
-> Left-hand side of the analysis unit housing
-> Valve 1 connection f

B

Black

950 mm

3.2 mm

Yellow/blue

Acid solution A
-> Pump 3
-> Left-hand analysis cuvette

C

Purple

380 mm

3.2 mm

Blue/yellow

Valve 1 connection g
-> Pump 1
-> Digestion cuvette

D

Red

215 mm

2.7 mm

Blue/yellow

Digestion cuvette
-\> Valve 2 connection d

E

Green

550 mm

3.2 mm

Gray

Valve 2 connection g
-> Pump 2
-> Right-hand analysis cuvette

F

Purple

230 mm

3.5 mm

-

Valve 2 connection e
-> Lower right-hand analysis cuvette (air)

G

Red

220 mm

3.0 mm

-

Digestion solution B
-> Valve 1 connection d

H

Orange

220 mm

3.0 mm

-

Distilled water
-> Valve 2 connection b

J

Blue

250 mm

3.0 mm

Black/purple/

gray

Valve 2 connection c
-> T-piece -\> Pump 4 -\> Lower analysis
cuvette
-> T-piece -\> Waste bottle
-> Valve 1 connection c

WA R N I N G

Possible risk of injury due to the sample needle.
Make sure that the system is only installed by qualified and trained personnel.

Advertising
This manual is related to the following products: