1 unpacking, 2 installation, 1 unpacking 3.2 installation – Hach-Lange FILTRAX eco User Manual

Page 16

Advertising
background image

16

Installation

3.1 Unpacking

3.2 Installation

N O T I C E

The filter module should only be unpacked directly before
commissioning and quickly attached to the module carrier. The filter
membranes are packed in protective plastic; once they have been
moistened they must not be allowed to dry out.

Figure 9 Example of installation

with optional control unit bracket LZX676 and optional basin edge attachment LZX414.00.XXXXX

1

Control unit

5

Module carrier with filter module

2

Process instrument

6

Bracket for FILTRAX eco module carrier (optional)

3

Sample tube

7

5 m [16.4 ft] suction tube

4

Bracket for FILTRAX eco control unit (optional)

Advertising