1 unpacking, 2 installation, 1 unpacking 3.2 installation – Hach-Lange FILTRAX eco User Manual
Page 16
Advertising
16
Installation
3.1 Unpacking
3.2 Installation
N O T I C E
The filter module should only be unpacked directly before
commissioning and quickly attached to the module carrier. The filter
membranes are packed in protective plastic; once they have been
moistened they must not be allowed to dry out.
Figure 9 Example of installation
with optional control unit bracket LZX676 and optional basin edge attachment LZX414.00.XXXXX
1
Control unit
5
Module carrier with filter module
2
Process instrument
6
Bracket for FILTRAX eco module carrier (optional)
3
Sample tube
7
5 m [16.4 ft] suction tube
4
Bracket for FILTRAX eco control unit (optional)
Advertising