Installation

3.3 Mechanical installation

3.3.1 Attach the control unit to a wall

1. Select a suitable attachment point for the instrument.

Make sure that there is sufficient space for tubes, cabling and
maintenance operations.

2. Drill the top two holes in accordance with the adjacent diagram.

3. Attach the instrument at the top two mounts and mark the lower

mount.

4. Drill the bottom hole and finish attaching the instrument.

D A N G E R

Select an appropriate installation location for the instrument.
Plan out the mechanical mount before positioning poles or drilling holes.
Make sure the mount has a sufficient bearing capacity. The dowels must
be selected and authorized according to the condition of the wall.
The manufacturer shall accept no liability if the instrument is installed
incorrectly.
Plan how to lay cables and tubes and their path in advance.
Lay the tubes, data cables and power cables without any bends and so
they do not pose a tripping risk.

N O T I C E

For information on installation with optional accessories, refer to the
relevant installation instructions.

N O T I C E

The filter module should only be unpacked directly before
commissioning and quickly attached to the module carrier.
The filter membranes are shrink-wrapped in protective plastic; once they
have been moistened they must not be allowed to dry out.