Installation – Hach-Lange FILTRAX eco User Manual
Page 25
Advertising
25
Installation
1. Make sure that the instrument is disconnected from the mains.
2. Open the housing door.
3. Remove the 4 cross-head screws from the cover (refer to
) and remove the cover.
4. Connect the cable in accordance with
.
Figure 16 Terminal assignment
1
Power supply cable (power supply)
3
Heater connection cable, sample tube
2
Protective conductor connection
4
Heater connection cable, suction tube
Sicherungen/Fuses
250 V
F1:
F2:
F3:
F4:
T3,15A L
T3,15A L
T6, 3A L
T6, 3A L
T4A E
T4A E
T7A E
T7A E
IEC
UL
N O T I C E
Route the signal lines (21, 22, 23, 24) separated from the power cable.
Advertising