Enclosure 8. power connection – Controlled Products Systems Group 104301 User Manual

Page 25

Advertising
background image

The obstacle detection function is achieved by controlling the

current absorption and / or through the encoder connected to

the motors.
If the gate encounters an obstacle during the movement of

opening or closing, the obstacle detection function is activated

and the operator reverses the direction of the gate.
In case of a second consecutive obstacle the operator stops

the gate right away and any further command is inhibited. To

re-enable the automation, you must remove power or open the

STOP contact input. Until this “reset” the Audio Alarm output

will be active.

7. At the point where you want the slowdown to start give an

OPEN A command with the push button or the remote that

is already stored in memory. Leaf 2 starts to slow down and

stops when it reaches the mechanical stop or FCA2.

8. Leaf 2 starts to close at the set speed (trimmer speed).
9. At the point where you want the slowdown to start give an

OPEN A command with the push button or the remote that

is already stored in memory. The leaf 2 starts to slow down

and stops when it reaches the mechanical stop or FCC2.

10. Leaf 1 starts to close at the set speed (trimmer speed).
11. At the point where you want the slowdown to start give an

OPEN A command with the push button or the remote that

is already stored in memory. Leaf 1 starts to slow down and

stops when it reaches the mechanical stop or FCC1.

12. The manual time learning procedure is complete.

15

15/32

6 7/32”

17

15/32

The E024U board is supplied on a panel that fits in a 16x14”

enclosure.

On the back panel are installed the control board, the power

supply and additional accessories.

Power Supply

AC connection

Power outlet
and switch

Pushbutton

E24U board

DIN rail

Batteries

AC POWER GUIDELINES:

THE E024U control board and power supply uses a single

phase AC power line to operate, charge the batteries, and power

gate accessories. Use the following guidelines when installing

the AC power:
1. Check the local wiring codes in all cases and follow all local

building codes. Wiring and hookup should be performed by a

qualified electrician/installer only.
2. AC power should be supplied from a circuit breaker panel and

must have its own dedicated circuit breaker. This supply must

include a green ground conductor.
3. Use copper conductor wires with liquid tight flexible conduit

UL listed for electric cable protection

14 AWG, 600V, 80°C

Terminal Block max Torque 2.1 Nm

4. Properly ground the gate operator to minimize or prevent

damage from power surges and/or lightning. Use a grounding

rod if necessary. A surge suppressor is recommended for ad-

ditional protection.

6.3 OBSTACLE DETECTION FUNCTION

7. ENCLOSURE

8. POWER CONNECTION

A13

E024U CONTROL BOARD

Advertising