Fulton Ancillary Equipment SteamPac Unfired Steam Generators User Manual

Page 70

Advertising
background image

Fulton Thermal Corp.*SteamPac Unfired Steam Generators Manual* Version 2010-0201

Page 70

a) Houses probes for electronic water level controller

b) Sight glass incorporated into water bottle for visual inspection of water level

c) Cast construction as per ASME Code Section I

6. Instrumentation & Controls

a) The following instrumentation/controls/safety devices shall be supplied as a minimum

requirement:

1. Pressure Gauge – Fulton

2. Operating Pressure Control - Yokogawa UT-350 w/ pressure transducer

3. High Limit Pressure Control – Danfoss

4. Water Level Control - Fulton

5. Pump Motor Starter

6. Thermal Fluid 3-way Control Valve. Contractor to provide: 440/480/3/60

for pump operation and 120 volt/single phase for control circuit. Note:

Smaller Steampacs will have 120 volt/single phase motor.

7. Tests

a) Shall include a hydrostatic test of the pressure vessels in the presence of an

inspector having a National Board Commission. He shall certify a Data Report which shall

be delivered with the heater as evidence of ASME Code compliance.

b) Full electrical checks will be performed including testing of all controls and circuitry.

8. Operating Manual

a) Instructions for installation, operation, and maintenance of the heat transfer system shall

be contained in a manual provided with each unit.

b) A complete wiring diagram, corresponding to the equipment supplied, shall be part of the

manual and one shall also be affixed to the inside of the heater’s panel box.

Advertising