8 MAINTENANCE
NOTE
The operations outlined in this chapter are to be
performed by qualified maintenance personnel only.
8.1 Maintenance Schedule
Table 8-1: Preventative Maintenance Schedule
Item
Maintenance Interval
Reference Section
TEST functions
Check every month
Table 9-1
Zero/Span Calibration
Weekly or as needed
Section 7
Zero/Span checks
Daily
Section 7, Table 6-2
Particulate Filter
Weekly as needed
Figure 8-1
Zero air canister
Refill every 3 months
Section 8.4
Zero Air DFU filter
Change every 12 months
Section 8.4
Reaction cell cleaning
Clean annually and clean as necessary
Section 8.6, Figure 8-3
Sample Flow
Check every 6 months
Figure 8-3, Section 9.2.2
Pneumatic Lines
Examine every 12 months, clean if
necessary
Figure 8-3
Factory Calibration
Calibrate each year or after repairs
Section 9.1.6
Leak Check
Check every year
Section 8.8
Pump Diaphragm
Change annually