5. Maintenance Inspection

51

5. Maintenance Inspection

5.1

Inspection Items and Schedule

Follow the maintenance inspection schedule below.

It is assumed that the equipment is operating 8 hours per day.

If the equipment is running continuously night and day or otherwise running at a high operating rate, inspect more

often as needed.

External visual

inspection

Internal inspection

Greasing

Start of work inspection

{

1–month inspection

{

3–month inspection

{

{

(Rod sliding surface)

Every 3 months since

{

{

(Rod sliding surface)

6–month inspection

or every 5000km of

operated distance

{

{

{

(Ball Screw/Guide )

Every 1 year since

{

{

{

(Ball Screw/Guide)

5.2

External Visual Inspection

An external visual inspection should check the following things.

Main unit

Loose actuator mounting bolts, other loose items

Rod

Lubrication, dust, foreign object on sliding surfaces

Scraper (optional equipment) Damage, crack, scratch, wear㵨out

Cables

Scratches, proper connections

Overall

Irregular noise, vibration

* Scraper (optional equipment) is an expendable part. It may be shortened depending on the use environment or

operating condition, thus replace the scraper as soon as an abnormality is found.

5.3

Cleaning

Ɣ Clean exterior surfaces as necessary.

Ɣ Use a soft cloth to wipe away dirt and buildup.

Ɣ Do not blow too hard with compressed air as it may cause dust to get in through the gaps.

Ɣ Do not use oil–based solvents as they can harm lacquered and painted surfaces.

Ɣ To remove severe buildup, wipe gently with a soft cloth soaked in a neutral detergent or alcohol.