Tools, Installation procedures, Preinstalled components – IEI Integration RPC-6022G User Manual

Page 38: User installed components, 2 tools, Nstallation, Rocedures, 4 installation procedures

Advertising
background image

RPC-6022GW Rackmount LCD Workstation

Page 38

4.3.2 Tools

Before installing the RPC-6022GW Rackmount LCD Workstation, make sure the following

tools are on hand:

Phillips (crosshead) screwdriver: All the retention screws on the system

are Phillips screws.

Soft working mat: When installing the RPC-6022GW Rackmount LCD

Workstation, the screen should be placed face down on a soft working mat.

4.4 Installation Procedures

4.4.1 Preinstalled Components

The following components are preinstalled in the RPC-6022GW Rackmount LCD

Workstation.

Power supply unit (PSU)

Cooling fan modules

Drive brackets

LCD screen

4.4.2 User Installed Components

The following user supplied components need to be installed into the RPC-6022GW

Rackmount LCD Workstation:

Disk drives

Backplane and CPU card, or motherboard

PCI or ISA expansion cards (optional)

Advertising