Tools, Installation procedures, Preinstalled components – IEI Integration RPC-6022G User Manual
Page 38: User installed components, 2 tools, Nstallation, Rocedures, 4 installation procedures

RPC-6022GW Rackmount LCD Workstation
Page 38
4.3.2 Tools
Before installing the RPC-6022GW Rackmount LCD Workstation, make sure the following
tools are on hand:
Phillips (crosshead) screwdriver: All the retention screws on the system
are Phillips screws.
Soft working mat: When installing the RPC-6022GW Rackmount LCD
Workstation, the screen should be placed face down on a soft working mat.
4.4 Installation Procedures
4.4.1 Preinstalled Components
The following components are preinstalled in the RPC-6022GW Rackmount LCD
Workstation.
Power supply unit (PSU)
Cooling fan modules
Drive brackets
LCD screen
4.4.2 User Installed Components
The following user supplied components need to be installed into the RPC-6022GW
Rackmount LCD Workstation:
Disk drives
Backplane and CPU card, or motherboard
PCI or ISA expansion cards (optional)