Installation instructions – SaltDogg SHPE1500 Series Electric Drive Poly Hopper Spreader v.2 User Manual

Page 2

Advertising
background image

2

WARNING

Do not drill holes into fuel tanks, fuel lines, through

electrical wiring, etc that may be damaged by drilling.

Installation Instructions

1. Mounting the Spreader onto the Vehicle:

A. Remove the tailgate from the vehicle.
B. Check truck’s bed for any sharp debris or foreign

objects. These can cut and seriously damage

poly hopper.

C. Lift spreader using tie downs. See Figure 1.
D. Slide spreader forward until the steps on rear

legs of the spreader make contact with truck’s

bed. Measure the distance from the front of

the truck bed to front of the hopper's front

legs. Fabricate spacer to fit between front of

the spreader and front of the bed as shown in

Figure 2.

E. Center the spreader from side to side on the

vehicle. Securely strap the spreader to the truck

using four ratchet straps as shown in Figure 3.

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Verify with the vehicle’s manufacturer that the factory

installed anchor points are designed for tie-down such

load. Inspect straps and hardware after each time spreader

is loaded. Tighten straps and hardware if necessary.

2. Mounting the Spinner/Chute Assembly

A. Attach the Chute Assembly to the spreader.

First, hook the Chute to the spreader by open-

ings in the Chute’s handle.

B. Rotate the chute into operating position and

lock using the two spring latches.

3. Install Control Box and Vehicle Wiring Harness

(See Fig. 6).

NOTE: THIS IS A WIRE GROUND

ELECTRICAL SYSTEM! NO CONNECTIONS TO

TRUCK'S FRAME OR BODY ALLOWED!

Always disconnect battery before attempting to

install electrical components on your vehicle.

Use Tie Downs

Fig. 1

13.5

2" x 4"

2" x 6"

FIT TO BOX

FIT TO BOX

8"