Yokogawa ADMAG AXW User Manual

Page 15

Advertising
background image

<3. INSTALLATION>

3-6

IM 01E25D11-01EN

Mounting Procedure (with optional

Grounding Rings GR1 for sizes up to

1000 mm (40 in.)):

1. Handles of the grounding ring have some

holes which correspond to outer diameter

of each flange type. There are printings

near each hole. The printings show types

of flange. See the table below.

Printing

Process

Connection Code Flange Standard

ASME

-CA1

ASME B16.5

Class 150, ASME

B16.47 Class 150

AWWA

-CB1

AWWA C207

Class D

PN10

-CE1

EN1092-1 PN10

PN16

-CE2

EN1092-1 PN16

10K

-CJ1

JIS B2220 10K

AS

-CS1, -CS2, -CT1 AS2129 table D, E

AS4087 PN16

F12

-CG1

JIS F12 (JIS 75M)

2. Confirm the centering pin is fixed to the

hole corresponding to flange or fix the

centering pin to the correct hole.

3. Hang the grounding rings with their

flange type printings outer side of the

flowtube. Set the angle of both handles

symmetrically to be 45 degree from top. If

there are any bolt-holes under the handles,

turn the grounding rings clockwise in order

to locate handles between bolt-holes.

Center the grounding ring to the center of

the flowtube.

4. Connect the wire from the grounding ring

to the screw of the flowtube’s flange and fix

the wire by the nut. This procedure (item 1

to 4) must be done for the both sides of the

flowtube.

5. Install the flowtube into the customer’s pipe

with the gaskets A.

F0313.ai

Handle

Screw & Nut : Connect the wire from the

grounding ring or the customer’s pipe

Clockwise

Gasket B

Grounding Ring

Handle

Printed

Surface

Hole

Printing of

Flange Type

Flowtube

Centering Pin

Centering Pin

F12
10K

Note : Gasket A and B are also placed concentrically with

the flowtube.

Figure 3.3.5 Mounting Procedure with Grounding

Rings GR1 for sizes up to 1000 mm

(40 in.)

Mounting Procedure (with optional

Grounding Rings GR1 for sizes 1100mm (44

in.)) and above :

1. The grounding ring is temporarily fixed

onto the flowtube by four bolts. Hang the

grounding ring up using a crane or a hoist

so that it would not fall down from the

flowtube while setting the gasket B.

2. Unfasten the bolts and remove the

grounding ring off from the flowtube.

3. Place the gasket B to the flowtube. Cut out

holes on the gasket B if necessary, so that

the bolts can go through. Fix the grounding

ring to the flowtube by the four bolts again.

4. Connect the wire from the grounding ring

to the screw at the flowtube flange and fix

the wire by the nut. This procedure (item 1

to 4) must be done for the both sides of the

flowtube.

Advertising