Caution – Yokogawa ADMAG AXW User Manual

Page 16

Advertising
background image

<3. INSTALLATION>

3-7

IM 01E25D11-01EN

5. Install the flowtube into the customer’s pipe

with the gaskets A.

F0314.ai

Hang the grounding

ring up with this point.

Unfasten the bolts and

remove the grounding rings.

Cut out some holes on the

gasket B when necessary.

Wire

Grounding Ring

Flowtube

Screw & Nut : Connect the wire from the

grounding ring or the customer’s pipe.

Note : Gasket A and B should be placed concentrically with

the flowtube.

Figure 3.3.6 Mounting Procedure with Grounding

Rings GR1 for sizes 1100 mm (44 in.)

and above

Mounting Procedure (with optional

Grounding Rings GR2):

The grounding rings are installed and locked

onto the flowtube with gaskets B when shipped

from factory. Install the flowtube into the

customer’s pipe with gaskets A supplied by

customer.

(5) Tightening Nuts
Pass the bolts from pipe line side, not flowtube side,

and tighten the bolts according to the torque values

for the metal piping in Table 3.3.1 or 3.3.2

CAUTION

• Be sure to tighten the nuts according to the

prescribed toeque values. Tighten them

diagonally with the same torque values, step

by up to the prescribed torque value.

Advertising