Nematron Pointe Controller User Manual

Page 64

Advertising
background image

Chapter 3: Quickstart Project

Pointe Controller User Guide

62

When the download is complete, the Start button will become active.

4. Click the Start button to run the project.

5. Select the Charts tab, as shown below.

The PointeControl Monitor window should show that your one chart (as
configured in the Chart List) is running. The Pointe Controller unit is now
executing your project as a real-time control progam.

Advertising