Start-up – Mammoth V-Cube User Manual
Page 39
Item
Description
Inspection Date/Reading
4
Refrigerant pressure at
storage
Date
PSIG
Compressor #1
Compressor #2
Compressor #3
Compressor #4
Compressor #5
Compressor #6
Compressor #7
Compressor #8
5
Refrigerant pressure
every 3 months
Date
PSIG
Date
PSIG
Date
PSIG
Compressor #1
Compressor #2
Compressor #3
Compressor #4
Compressor #5
Compressor #6
Compressor #7
Compressor #8
6
Rotate blower impellers
every 2 months
Date
Date
Date
Date
Date
Date
Supply
Exhaust
Other
Grease fan bearings as
required
Supply
Exhaust
Other
Serial Number: _____________________________________
This unit has been checked out and started according with
the above procedures and completed forms and is oper-
ating satisfactorily. After 24 hours of satisfactory opera-
tion shut-down the unit and check all foundation bolts,
shaft bearings, drive set screws, valve train and terminals.
Tighten where required.
Additional Comments: ______________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Start-up
By _______________________________________________
Company Name ___________________________________
Date _____________________________________________
Email ____________________________________________
Telephone ________________________________________
Email to tech support: [email protected] or
Fax to: 819-399-2612.
VCES-V-CUBE-IOM-1A
39