Installation procedures, Required parts – AT&T Partner II User Manual

Page 33

Advertising
background image

Installation Procedures

Before installing the premises equipment, be sure you read the safety
instructions on page 2-ii. In addition, be sure you have the parts shown in
Figure 2-3 (if not, call the Helpline as instructed on the inside front cover of this

guide). You will have up to four types of component packages; Figure 2-3
shows the contents of each package type in an area marked by a dashed line.

Required Parts

Primary Carrier

Primary

Cover

Processor

Backplane

Module

AC Power Cord

MLS-34D

Programming

Overlay

MLS-12D

Programming

Overlay

Quick Reference Cards

(3 packages of 6)

Expansion Carrier

206 Module

400 Module

267F2

Bridging

Adapters (2)

7-foot

Expansion

7-foot

Processor Module

Backplane

206

Telephone

400

Module

Line Cords (2)

Module

Cord

AC Power

Expansion Cable

Cover

Telephone

Line Cords (4)

Figure 2-3. Premises Equipment Parts

NOTES:

1.

For each carrier, you will need to obtain four #12 screws of the appropriate
type for the wall and the weight of the carrier (a carrier with two 206 modules,
two 400 modules and a processor module weighs approximately 27.5 pounds).

2.

If you need modular telephone cords for connecting the extension jacks on

the equipment controller to the modular connecting blocks for extensions in the
equipment room, short telephone cords for wall mounting MLS-model phones,
or a 355A/355AF adapter and D8W telephone cord for connecting a call

reporting device, order them before installation. See “Product Ordering
Information” in Appendix C for ordering instructions.

2-8

Installing the Equipment

Advertising