Crystal nVision Lab Reference User Manual

Page 19

Advertising
background image

Modules

17

nVision Operation Manual

5

Install a new module in the same orientation as the one removed in step 4. The tri-lobe design of the module will not allow improper installation; do not

force installation of the module as permanent damage may occur. To ensure an IP67 rated seal, lightly lubricate the module’s o-ring (P/N: 4110) with Dow
111 silicon lubricant or equivalent.

(4x)

Lightly lubricate the o-ring, then install the module in the proper orientation.

Note:

If installing a Blank Plate, confirm orientation is flat and even within the module bay for proper sealing.

6

Tighten face plate T10 Torx screws to 50 in-oz (0.35 newton meter (N-m)) torque.

7

Replace power module/plug and tighten to 50 in-oz (0.35 newton meter (N-m)) torque to ensure IP67 seal. When power is first applied the unit will automatically

turn on. Ensure that nVision recognizes the new module by confirming in CrystalControl or the Summary screens.

8

Before using the nVision to record, Erase All Data. See

Recording

in the Chassis chapter.

9

If you have any problems during this process, check the

Troubleshooting section

for relevant information or contact us at

[email protected]

or (805) 595-5477.