Installation instructions, Step 1 mount template, Step 2 adjust frame height – GE ZV925SLSS User Manual

Page 12

Advertising
background image

12

• Align the template with the marks on the ceiling

and tape in place.
– Be sure the template is oriented correctly with the

front of the hood.

• Use a plumb bob to be sure the mounting holes

will provide parallel alignment with the countertop
below.

• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16"

bit and drill approximately 1-1/2" deep.

• Drive 4 hex head wood screws into the center of

the ceiling joists and cross framing. Leave a 1/4"
gap to allow the screw head to engage the keyhole
slots on the support frames.

• Cut the 8-1/2" duct opening through the sheet rock.

STEP 1 MOUNT TEMPLATE

Installation Instructions

STEP 2 ADJUST FRAME HEIGHT

•Measure exact ceiling height.
• Find the exact frame height

required on the chart on page 6.

• Remove 2 screws on each of the

4 sides of the frame to loosen the
upper structure, lower structure
and blower/motor.

• Adjust the height “X”, according to

the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.

1/4" Gap

24"min.

30"max.

36"min.

Frame

height

2-3/4"

Ceiling

height

X

49-80406

Printed in Italy 04-06 JR

36Hood

Template

8-1/2

Dia.

Cut a 1Dia.

Wire Access

Hole

Cut a 1Dia.

Wire Access

Hole

Drill 3/16

Pilot Holes

Approx. 1-1/2

Deep

Drill 3/16

Pilot Holes

Approx. 1-1/2

Deep

10-1/16to

Centerline

of Holes

7-1/16to

Centerline

of Holes

FRONT OF HOOD

7-1/16to

Centerline

of Holes

,167$//$7,21³9(17('727+(2876,'(

Advertising