GE ZV925SLSS User Manual

Page 20

Advertising
background image

20

STEP 5 INSTALL LOWER STRUCTURE

TO UPPER STRUCTURE

• Slide lower frame into

the upper frame. Match
the marked alignment
holes.

• Secure the upper and

lower frame with 16
screws, 4 on each side
of the frame.

Installation Instructions

,167$//$7,21³5(&,5&8/$7,1*

STEP 6 INSTALL BLOWER/MOTOR

• Raise the blower/

motor piece toward the
assembled frame.

• Carefully raise the motor

to the marked reference
point while making sure
the duct piece slips over
the blower outlet flange.

• Secure the blower/motor

to the frame using 16
screws, 4 on each side.

• Use tape to seal the duct

connection.

Advertising