Installation preparation, Parts provided, Hardware package – GE ZV925SLSS User Manual
Page 8: Locate the parts packed with the hood

Installation Preparation
PARTS PROVIDED
Locate the parts packed with the hood.
HARDWARE PACKAGE
Locate and check
contents. Screws
shown actual size.
Air deflector for
recirculating installation
49-80406
Printed in Italy 04-06 JR
36≤ Hood
Template
8-1/2
≤Dia.
Cut a 1≤ Dia.
Wire Access
Hole
Cut a 1≤ Dia.
Wire Access
Hole
Drill 3/16≤
Pilot Holes
Approx. 1-1/2≤
Deep
Drill 3/16≤
Pilot Holes
Approx. 1-1/2≤
Deep
10-1/16≤ to
Centerline
of Holes
7-1/16≤ to
Centerline
of Holes
FRONT OF HOOD
7-1/16≤ to
Centerline
of Holes
Template
6 ceiling
mounting
screws
42 screws total:
• 24 support frame
screws
• 10 hood attachment
screws
• 2 upper duct cover
attachment screws
• 4 recirculating
deflector screws
• 2 duct cover bracket
attachment screws
12 sheet
metal
screws
Decorative duct covers
(14"wide, 12-3/16" deep when assembled)
12 cage
nuts
8
Telescoping
support frame
Upper duct cover trim pieces
2 each of 4 sizes
1 charcoal filter for
recirculating installation
Stainless steel filter
24-3/4"
23-1/4"
2 Duct cover
brackets
2 thumb
screws
Lower duct cover trim pieces
Note: Some additional hardware/screws included.