Installation instructions – GE ZV925SLSS User Manual

Page 13

Advertising
background image

13

Installation Instructions

STEP 3 CUT DUCT TO LENGTH FOR

VENTED INSTALLATION

• Measure from

house duct to
exhaust opening.

• Cut the 8" duct

length to size.

• Slip duct over the

exhaust opening.

• Seal the connection

with duct tape.

Duct

House

duct

Frame

height

Duct

length

STEP 4 INSTALL THE SUPPORT FRAME

• Raise the support toward

the ceiling.

• Thread the house wiring

through one of the large
holes, preferably on the
left side.

• Carefully engage the

ceiling mounting screws
to the keyhole slots AND
the house duct in the top
of the frame.

• Tighten the 4 mounting

screws against the frame.

• Install 2 safety screws.
• Use duct tape to seal the

duct connection at the top.

Duct

STEP 5 INSTALL HOOD ATTACHMENT

SCREWS

• Install 4 hood attachment screws in the bottom of

the support as shown. Leave 1/4" gap between
screw head and support flange.

Safety

screws

Keyhole

slots

House

wiring

Keyhole

slots

Install 4

attachment

screws

,167$//$7,21³9(17('727+(2876,'(

Advertising