Installation preparation, Construct ceiling support – GE ZV925SLSS User Manual

Page 9

Advertising
background image

9

Plan the Location of the Hood and Ductwork
• Use a plumb bob to check the location. The

countertop/cooktop below the hood must be
centered with the hood.

• The hood should extend beyond the front and rear

edge of the cooking appliance.

• The duct in the ceiling must be centered over the

cooktop.

CONSTRUCT CEILING SUPPORT

Installation Preparation

Top view – ceiling joists parallel to front of hood

10-1/16"

Install cross-framing

symmetrically over

duct/cooktop

centerline

16" joist

spacing

7-1/16"

8” duct

Front

of

hood

2x4 cross

framing

Cooktop

outline

Align duct

to center of

cooktop

Ceiling Support Structure
• At the hood location, install 2 x 4 cross framing

between ceiling joists as shown. (2x4’s are required to
support the weight of the hood.)

• Arrange cross framing in the ceiling to suit the

existing structure.

• Your ceiling joists will be like one of the following

examples.

EXAMPLE A

Ceiling

Hood

ducting

centerline

Cooktop

Countertop

Front

27-9/16"

13-3/4"

Side view

Align with

center of

cooktop

Advertising