GE ZV925SLSS User Manual

Page 23

Advertising
background image

23

Installation Instructions

,167$//$7,21³5(&,5&8/$7,1*

STEP 11 PREPARE THE DUCT COVERS

• Remove the plastic protective covering on all duct

pieces.

• Install 3 cage nuts on each inside section of

the top duct cover. The cage nuts fit into the
rectangular slots, clips facing outward.

• Install 3 cage nuts on each side of the lower

duct covers.

Support

frame

Plan

diagram

Rectangular

slots

Nut

STEP 12 INSTALL UPPER DUCT COVER

• Place the tall duct covers onto the top of the

hood. This section has venting holes on one end.

NOTE: If you are installing this hood for

recirculating operation, place the duct covers
onto the hood with the venting slots at the top.

If the hood is vented to the outside, the holes

should be positioned on the bottom.

• Secure the sides with 6 screws installed through

the cage nuts.

• Raise the assembled duct covers to the top,

against the ceiling.

• Match mounting holes, one on each side. Install

screws through the duct and into the support.

Top

sections

Top

sections

Advertising