Installation preparation, Caution, Prudence – GE ZV925SLSS User Manual

Page 7: Tools and materials required, Remove the packaging

Advertising
background image

7

Installation Preparation

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

Pencil and tape measure

Pliers

120V 60Hz. 15 or 20 Amp,

2-wire with ground. properly

grounded branch circuit.

Key hole saw

Wire cutter/stripper

Step ladder

Metal snips

Saber saw

or sawsall

Wire nuts

Phillips and

flat blade

screwdrivers

Strain relief for

junction cover.

Spirit level

Flashlight

Safety glasses

8" round metal

duct, length to

suit installation.

Duct tape

3/8" swivel

socket or pivoting

hex socket with 6"

extensions

Carpenter’s square

REMOVE THE PACKAGING

CAUTION:

LIFT THE HOOD OUT OF THE

BOX BY THE CENTER METAL PORTION. DO NOT LIFT

BY THE GLASS SIDES.

PRUDENCE :

LEVEZ LA HOTTE À

L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL

CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.

CAUTION:

Wear gloves to protect

against sharp edges.

PRUDENCE :

Portez des gants pour

éviter les blessures causées par les tranchants.

• Grasp the hood by the metal insert in the center

and lift straight up and out of the box.

• Remove and properly discard the plastic wrapping.
• Remove parts box, duct covers and other

packaging.

Hammer

Electric or battery-operated

drill and 3/16" bits, Phillips and

flat blade screwdriver bits.

Advertising