Installation Overview

Page 2-3

Installation

Overview

The table below describes the steps needed to install the
IntraSwitch 5324. The steps that are optional are labeled
“optional”; the steps that are required are labeled “required.”
The sections that follow explain each step in detail.

To install the IntraSwitch 5324:

Table 2-1 Installation Overview

Step

Action

1

(required)

Open the box and check the contents.

See “Package Contents” on page 1-7 for a
complete list of the items included with your
IntraSwitch 5324.

2

(required)

Check the power connection.

See “Connecting Power” on page 2-4.

3

(required)

Install the IntraSwitch in an equipment rack or
prepare it for desktop placement.

See “Rack Mounting/Desktop Placement” on
page 2-5.

4

(required)

Connect the IntraStack to the network.

See “Connecting to the Network” on page 2-7.

5

(optional)

Configure the IntraStack for management
capabilities.

See “Setting up for Management” on page 2-10.

6

(optional)

Install MII module(s), if any.

See “Installing MII Modules” on page 2-13.