Chapter 3, Installing the hardware, Chapter 3: installing the hardware – Allied Telesis x600-48Ts/XP User Manual
Page 53
Advertising
53
Chapter 3
Installing the Hardware
This chapter provides procedures to install an x600 switch. The chapter
contains the following sections:
“Reviewing Safety Precautions” on page 54
“Unpacking a Switch” on page 56
“Installing the Power Cord Retaining Clip” on page 57
“Installing the Switches in an Equipment Rack” on page 58
“Resetting the Switch” on page 60
Advertising
This manual is related to the following products: