Sfp handle – Allied Telesis x600-48Ts/XP User Manual

Page 69

Advertising
background image

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

69

3. Position the transceiver with the label facing up.

4. Slide the transceiver into the slot until it clicks into place.

Figure 33. Installing an SFP Transceiver

5. For the x600-24Ts and x600-24Ts/XP switches, verify that the handle

on the SFP transceiver is in the upright position, as shown in
Figure 34, to prevent inadvertently removing the transceiver.

Figure 34. Positioning Handles on the x600-24Ts and x600-24Ts/XP

Switches

1331

23R

24R

CLASS 1

LASER PRODUCT

D/C

L/A

1000 LINK /

ACT

FDX

POR

T AC

SFP

21

22

23

24

1331

23R

24R

CLASS 1

LASER PRODUCT

D/C

L/A

1000 LINK /

ACT

FDX

POR

T AC

SFP

21

22

23

24

SFP Handle

Advertising
This manual is related to the following products: