7 sequence plans for the programmer, 1 creating readiness to operate, Sequence plans for the programmer – Festo Кабели и принадлежности User Manual

Page 90: Creating readiness to operate

Advertising
background image

4. Commissioning

4−44

Festo P.BE−SPC200−COM−PDP−E N en 0901c

4.7

Sequence plans for the programmer

The following sequence plans will assist you in programming
a higher−order PLC/IPC. They show you how to:

ć

create readiness to operate

ć

start NC records in Record Select mode

ć

start NC programs in Start/Stop mode

ć

quit faults.

The signal names are printed in upper case letters. For
example: READY stands for the READY signal, 1 stands for the
1 signal, 0 stands for the 0 signal.

4.7.1 Creating readiness to operate

When the power supply is switched on, the SPC200 performs
the initialization and self test of the connected modules. This
initialization phase can take a certain amount of time, deĆ
pending on the equipment fitted on the system (max. 10 s).

Please note
During this initialization phase no further rising edge may
be generated at the START/RESET input.

After the initialization phase there may be a fault (e.g. hardĆ
ware fault), even if the READY output supplies a 1−signal for a
short period. You must therefore wait a further

ţ 100Ăms after

the first recognition of the 1−signal at the READY output. The
signal at the READY output must then be scanned once again
for a 1−signal (see Fig. 4/15 and Fig. 4/16; Sequence plan
Creating the readiness to operate").