3. Commissioning

3−4

Festo P.BE−CPX−CEC−EN en 1004a

4. In the "Object Organizer", change to "Resources".

5. Open the "PLC Configuration".

6. Select the Root node, if applicable.

7. Open the "Network configuration" tab.

8. Carry out the "Search network" function.

9. Select the desired CoDeSys controller.

10. Carry out the "Set as active PLC" function.

11. Save the project.

You can now log in to the controller, if necessary.