Fitting buffers with frame – ARB 3915030 User Manual

Page 18

Advertising
background image

Last Rev Date: 29/10/2008

Page 18 of 24

Fitting instructions# 3783321

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

FITTING BUFFERS WITH FRAME


62. Fit the striker pin to the RHS hinge plate and

secure with 5/16”UNC nut and spring washer
as shown and tighten to 22Nm or 16lbft

63. Fit a urethane buffer pad to each of the right

angle brackets using M4x16 csk head screws
and M4 nyloc nuts, to create a pair of RH and
LH assemblies as shown.

64. Tighten the screws until the heads are 1.5mm

below the face of the urethane pad

65. Fit the RHS buffer pad assembly as shown,

wedge of pad up. Secure with 2 x M8 bolts,
washers and flange nut sets. Load bolts from
inboard side of upright, nuts are on bracket
side.


66. With the striker pin engaged fully in the latch

and a slight amount of pressure on the frame
pushing it back against the slam latch, pull
the pad hard against the hinge bracket flange
as shown.


67. Tighten the M8 bolts to recommended torque.

68. Repeat for the LHS

The intention once the assembly is
complete is for the frame to feel solid
without any play.

Screw in until
head is below
surface by 1.5mm

Advertising