Wheel torque chart -36 – JLG 450A_AJ Series II Operator Manual User Manual
Page 116
Advertising
SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
6-36
– JLG Lift –
3121289
2.
Tighten nuts in the following sequence:
3.
The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
4.
Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
1
2
3
4
5
6
7
8
9
Table 6-20. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
40 ft-lb
(55 Nm)
100 ft-lb
(130 Nm)
170 ft-lb
(255 Nm)
Advertising