GENERAL

Begin the "Walk-Around Inspection" at Item 1, as noted on the
diagram. Continue to the right (counterclockwise viewed from
top) checking each item in sequence for the conditions listed in
the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.

INSPECTION NOTE: On all components, make sure there are no
loose or missing parts, that they are securely fastened, and no visi-
ble damage, leaks or excessive wear exists in addition to any other
criteria mentioned.

1.

Platform Assembly and Gate - Footswitch works properly,
not modified, disabled or blocked. Gate latch, stop, and
hinges in working condition.

2.

Platform & Ground Control Consoles - Switches and
levers return to neutral, decals/placards secure and legible,
control markings legible.

3.

All Hydraulic Cylinders - No visible damage; pivot pins
and hydraulic hoses undamaged, not leaking.

4.

Boom Sections/Uprights/Turntable - See Inspection
Note.

5.

Boom Limit Switches - Switches operate properly.

6.

Drive Motor, Brake, and Hub - No evidence of leakage.

7.

Wheel/Tire Assemblies - Properly secured, no missing lug
nuts. Inspect for worn tread, cuts, tears or other discrepan-
cies. Inspect wheels for damage and corrosion.

8.

Hood Assemblies - See Inspection Note.

Figure 2-4. Daily Walk-Around Inspection - Sheet 2 of 3