Function check, Function check -5 – JLG 450A_AJ Series II Operator Manual User Manual

Page 29

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121289

– JLG Lift –

2-5

11.

Function Check – Once the “Walk-Around” Inspection is
complete, perform a functional check of all systems in an
area free of overhead and ground level obstructions. Refer to
Section 4 for more specific instructions.

IF THE MACHINE DOES NOT OPERATE PROPERLY, TURN OFF THE MACHINE IMMEDIATELY!
REPORT THE PROBLEM TO THE PROPER MAINTENANCE PERSONNEL. DO NOT OPERATE
THE MACHINE UNTIL IT IS DECLARED SAFE FOR OPERATION.

Function Check

Perform the Function Check as follows:

1.

From the ground control panel with no load in the platform:

a. Check that all guards protecting the switches or locks

are in place;

b. Operate all functions and check boom limit switches;

drive speed should switch to creep mode if lower boom
is elevated or main boom is above horizontal.

c.

Check auxiliary power (or manual descent);

d. Ensure that all machine functions are disabled when

the Emergency Stop Button is activated.

e. Ensure all boom functions stop when the function

enable switch is released.

2.

From the platform control console:

a. Ensure that the control console is firmly secured in the

proper location;

b. Check that all guards protecting the switches or locks

are in place;

c.

Operate all functions and check all limiting and cut-out
switches;

d. Ensure that all machine functions are disabled when

the Emergency Stop Button is pushed in.

e. Ensure that all machine functions stop when the foot-

switch is released.

3.

With the platform in the transport (stowed) position:

a. Drive the machine on a grade, not to exceed the rated

gradeability, and stop to ensure the brakes hold;

b. Check that the tilt indicator is illuminated to ensure

proper operation.

Advertising