SECTION 4 - MACHINE OPERATION

4-12

– JLG Lift –

3121289

4.11

SHUT DOWN AND PARK

The procedures to shut down and park the machine are as fol-
lows:

1.

Drive machine to a reasonably well protected area.

2.

Ensure boom is lowered over rear drive axle.

3.

Shut down Emergency Stop at Platform Controls.

4.

Shut down Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center OFF.

5.

If necessary, cover Platform Controls to protect instruction
placards, warning decals, and operating controls from hos-
tile environment.

4.12

LIFTING AND TIE DOWN

Lifting

1.

Refer to the Serial Number Tag, call JLG Industries, or weigh
the individual unit to find out the Gross Vehicle Weight.

2.

Place the boom in the stowed position.

3.

Remove all loose items from the machine.

4.

Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.

Tie Down

WHEN TRANSPOR TING THE MACHINE, THE BOOM MUST BE
FULLY LOWERED INTO THE BOOM REST.

1.

Place the boom in the stowed position.

2.

Remove all loose items from the machine.

3.

Secure the chassis and the platform using straps or chains of
adequate strength.