13 towing, Prior to towing, 13 towing -14 – JLG 450A_AJ Series II Operator Manual User Manual
Page 68: Prior to towing -14, Drive disconnect hub -14
SECTION 4 - MACHINE OPERATION
4-14
– JLG Lift –
3121289
4.13
TOWING
RUNAWAY VEHICLE/MACHINE HAZARD. MACHINE HAS NO TOWING BRAKES. TOWING
VEHICLE MUST BE ABLE TO CONTROL MACHINE AT ALL TIMES. ON-HIGHWAY TOWING NOT
PERMITTED. FAILURE TO FOLLOW INSTRUCTIONS COULD CAUSE SERIOUS INJURY OR
DEATH.
MAXIMUM TOWING SPEED 5 M.P.H. (8 K.M.H.) FOR NO LONGER THAN 30-45 MINUTES.
MAXIMUM TOWING GRADE 25%.
Prior to Towing
Prior to towing the machine, complete the following:
DO NOT TOW MACHINE WITH ENGINE OPERATING OR DRIVE HUBS ENGAGED.
1.
Retract, lower and position boom over rear drive wheels in
line with direction of travel.
2.
Disconnect drive hubs by inverting disconnect cap. (See Fig-
ure 4-5.) After towing the machine, complete the following:
3.
Reconnect drive hubs by inverting disconnect cap. (See Fig-
ure 4-5.)
Figure 4-5. Drive Disconnect Hub