Receptacles, Receptacles -29, Platform receptacle box removal -29 – JLG 80SL Service Manual User Manual

Page 65

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3121325

– JLG Lift –

3-29

Receptacles

DISCONNECT BATTERY SUPPLY ON GROUND CONTROL PANEL
BEFORE REMOVING RECEPTACLE BOX.

1. Remove front platform floor panel to expose the

bolts connecting the Receptacle Box (1) to the plat-
form.

2. Disconnect all wires connected to the 110V Recep-

tacle (5) and Platform Control Box Outlet (6).

3. Remove the four Bolts (2), eight Flatwashers (3), and

four Nuts (4).

4. Lift box from platform.

5. The 110V Receptacle (5) can be removed from the

box by removing the four screws on the backside.

6. The Platform Control Box Outlet (6) can be removed

by removing the four Bolts (7), eight Flatwashers (8),
and four Nuts (9).

Installation:

1. Follow Removal steps in reverse order.

2, 3, 4

1

5

6

7, 8, 9

1. Receptacle Box

2. Bolt, M6 x 20mm

3. Flatwasher, M6 (qty 2)

4. Nut, M6

5. 110V Receptacle

6. Platform Control Box Outlet

7. Bolt, M5 x 16

8. Flatwasher, M5 (qty 2)

9. Nut, M5

Figure 3-27. Platform Receptacle Box Removal

Advertising