Main platform side rails, Main platform side rails -30, Side rails removal -30 – JLG 80SL Service Manual User Manual

Page 66

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3-30

– JLG Lift –

3121325

Main Platform Side Rails

NOTE: Before rails can be lowered, loosen the bolt on the

plastic rail-guide rollers and lower the roller so that it
is not hindering the lowering of the rails.

SIDE RAILS WEIGH APPROXIMATELY 72.3 LBS (32.8 KG) EACH.
USE CAUTION WHEN REMOVING ANY PLATFORM RAIL.

NOTE: All procedures apply to the opposite side.

Removal:

NOTE: The below procedures apply to both right and left

side rails.

1. Disconnect side rail (1) from the end rail by pulling

the Cotter Pin (2) from the Pin (3). Remove the Pin
from the Bar (4) and Pin (5) located on the end rail.

2. Remove the Cotter Pins (9) from the Pins (10) on all

three Hinge Brackets (11). Pull the Pin out of the
side rail. Carefully fold rail down to the stowed posi-
tion.

3. Side rail can now be removed from the platform by

removing the Bolts (12), Chain Assembly Mounting
Plates (13), Flatwashers (14) and Locknuts (15) on
all three rail legs.

4. Remove the Tubes (16) once the rail is removed.

Installation:

NOTE: The below procedures apply to both the right and left

side rails.

1. Follow the removal procedures in reverse order

when installing the side rails.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

14

15

16

1. Side Rail
2. Cotter Pin
3. Pin
4. Bar
5. Pin
6. Bolt, M12 x 40mm

7. Locknut, M12
8. Pin
9. Cotter Pin

10. Pin
11. Hinge Bracket
12. Bolt, M10 x 120mm

13. Chain Assembly Mounting Plate
14. Flatwasher, M10
15. Locknut, M10
16. Tube

Figure 3-28. Side Rails Removal

Advertising