Platform extension end rail, Platform extension end rail -33, Extension end rail removal -33 – JLG 80SL Service Manual User Manual
Page 69
SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS
3121325
– JLG Lift –
3-33
Platform Extension End Rail
Removal
1. If applicable, detach the end rail (1) from the side
rails (see removal instructions for side rails on previ-
ous page).
2. Remove Cotter Pins (2) from Pins (3).
3. Pull Pins out of Hinge Brackets (4).
4. Carefully lower rail to its stowed position.
5. Secure rail.
6. Remove the Bolts (5), Locknuts (6), Flatwashers (7),
and Chain Assembly Mounting Plate (8).
7. Carefully remove the rail.
8. Remove the Tube (9) from the rail.
Installation
1. Follow the Removal instructions in reverse order
when installing the platform extension end rail.
1
2
3
4
5
6
7
7
8
9
1. Extension End Rail
2. Cotter Pin
3. Pin
4. Hinge Bracket
5. Bolt, M10 x 120mm
6. Locknut, M10
7. Flatwasher, M10
8. Chain Assembly Mounting Plate
9. Tube
Figure 3-31. Extension End Rail Removal