Main platform end rails, Main platform end rails -31, End rail removal -31 – JLG 80SL Service Manual User Manual

Page 67

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3121325

– JLG Lift –

3-31

Main Platform End Rails

Removal:

1. If applicable, disconnect end rails (1,2,3) from side

rails. (see removal instructions for side rails on pre-
vious page).

2. Remove Cotter Pins (5) from Pins (6) on rail legs.

3. Fold rails down to the stowed position.

4. Remove Bolts (7), Flatwashers (8), Locknuts (10),

and Chain Assembly Mounting Plates (9).

5. Carefully remove the rail.

6. The Gate (3) can be detached from the right side

End Rail (1) by removing the screws on the two
Hinges (11).

Installation:

NOTE: Place the rail(s) on the platform in their stowed posi-

tion when installing.

1. Follow the removal instructions in reverse order.

2. Attach End Rails to Side Rails via the pins in Figure

3-28.

1

2

3

5

6

7

8

9

10

8

11

4

1. End Rail (right side)
2. End Rail (left side)
3. Gate
4. Platform

5. Cotter Pin
6. Pin
7. Bolt, M10 x 120mm
8. Flatwasher, M10

9. Chain Assembly Mounting Plate

10. Locknut, M10
11. Hinge

Figure 3-29. End Rail Removal

Advertising