Adjusting end play – JLG E45A_AJ ANSI Service Manual User Manual
Page 46
Advertising
SECTION 2 - PROCEDURES
2-30
– JLG Lift –
3120765
2.
If tolerance exceeds .010", reduce end play to less
than .005". Refer to Adjusting End Play.
Adjusting End Play
1.
Remove end plate.
2.
Measure and record total thickness of existing shim
pack.
3.
Determine thickness of shim pack required to obtain
.001" - .005" end play.
4.
Adjust shim pack thickness as required to obtain
proper end play. Reduce end play by removing
thicker shims and replacing with thinner shims,
included in kit.
5.
Replace end plate and torque bolts to 90 ft. lbs. (122
Nm).
6.
Recheck end play.
Figure 2-33. Swing Bearing Torquing Sequence
Allowable Tolerance
.001 to .005
(
)
Fig 2 Adjusting End Play.
END PLATE
SHIMS
Advertising
This manual is related to the following products: